SS = z x sd x sqrt(L)
The buffer that covers demand variability during a lead time at the target service level.
| Symbol | Meaning | Unit | Notes |
|---|---|---|---|
| SS | Safety stock | number | Buffer held in units. |
| z | Service factor | number | 1.645 at 95 percent and 2.326 at 99 percent. |
| sd | Demand standard deviation | number | Standard deviation of daily demand. |
| L | Lead time | number | Days from placing an order to receipt. |
What Each Symbol Means
SSnumber
Safety stock
Buffer held in units.
znumber
Service factor
1.645 at 95 percent and 2.326 at 99 percent.
sdnumber
Demand standard deviation
Standard deviation of daily demand.
Lnumber
Lead time
Days from placing an order to receipt.
See It Worked With Real Numbers
A formula on its own does not tell you which number goes where. The how to calculate safety stock page applies this equation to a concrete case, shows every intermediate step, and names the mistakes that produce a wrong answer even when the algebra is right.
Where This Formula Appears
This equation is the working core of How To Calculate Safety Stock, filed under Business. Every number the guide produces comes from substituting into this one line.
Common Questions
What is the formula for Safety stock?
The formula for Safety stock is SS = z x sd x sqrt(L). The buffer that covers demand variability during a lead time at the target service level.
What does each symbol in Safety stock stand for?
SS is safety stock; z is service factor; sd is demand standard deviation; L is lead time.
What units should I use with Safety stock?
Substitute SS in number, z in number, sd in number, L in number. Convert every input to those units before you start, because the equation only returns the right answer when the units on both sides agree.
What is a common mistake when using Safety stock?
Confusing safety stock with the reorder point. The reorder point is average demand during the lead time plus safety stock. The buffer is only the second term, and quoting one for the other understates or overstates orders by hundreds of units.